{"type":"FeatureCollection","features":[{"type":"Feature","geometry":{"type":"MultiLineString","coordinates":[[[16.311311904,48.155608137],[16.311334135,48.155622796],[16.311358825,48.155642652],[16.312051411,48.155929321],[16.313391148,48.156483525],[16.313475035,48.156514948],[16.313562387,48.156542648],[16.314168834,48.156721507],[16.314566661,48.156832804],[16.314700528,48.156877023],[16.314806256,48.156911892],[16.314858227,48.15693052],[16.315018341,48.156987882],[16.315383022,48.157132212],[16.315672664,48.157295987],[16.316092005,48.157501336],[16.316299075,48.157515084],[16.316837995,48.157511001],[16.317396374,48.15763218],[16.318102271,48.157742915],[16.318670398,48.157847849]]]},"properties":{"name":"Auer-Welsbach-Stra\u00dfe und Kirchfeldgasse von Karl-Heinz-Gasse bis Altmannsdorfer Stra\u00dfe","description":"3","Jahr":"2026","Massnahme":"Fahrradstra\u00dfe","Bezirk":"1230","Status":"in Vorbereitung","letzte Statusaenderung":"2026-02-25","Laenge":"611","url":"https:\/\/radnetz-dashboard.radlobby.at\/bauprogramm\/2026\/auer-welsbach-strasse-und-kirchfeldgasse-von-karl-heinz-gasse-bis-altmannsdorfer","Ankuendigung":"","Veroeffentlicht am":"","Baubeginn":"","Bauende":"","Fertigstellung":"","Tags":"Auer-Welsbach-Stra\u00dfe,Kirchfeldgasse,Fahrradstra\u00dfe","Netze":"HRVN Basisnetz,Radlobby-Basisnetz","field_protokoll":"2026-02-25 in Vorbereitung","field_route":"","type":"Bauprojekt","field_protokoll_json":"[{\u0022datum\u0022:\u00222026-02-25\u0022,\u0022status\u0022:\u0022in Vorbereitung\u0022,\u0022body\u0022:\u0022\u0022}]"}}]}